  "reviewed": "2026-09-19",
  "reviewedLabel": "19 September 2026",
  "scope": "Selected publicly documented campuses or distinct projects inside Illinois House District #75 or within 20 miles of its saved boundary. This is a dated research snapshot, not a complete census.",
  "geographyMethod": "Address pins use public ArcGIS geocoding. Project-area pins use published municipal maps, road descriptions or cited industry directory coordinates. Location accuracy values are conservative editorial buffers, not surveyed error estimates. District membership uses each representative point; the boundary warning applies whenever that buffer reaches the saved district line. Distances are approximate straight-line distances to that line.",
  "projects": [
    {
      "id": "cyrusone-aurora",
      "name": "CyrusOne Aurora · CHI1–CHI3",
      "place": "Aurora",
      "status": "operating",
      "statusLabel": "Operating campus",
      "statusEvidence": "CyrusOne lists its Aurora campus as an operating group of three data centers. This pin represents the campus, rather than three separate buildings.",
      "sourceDateLabel": "undated operator campus page",
      "locationLabel": "2905 Diehl Road, Aurora",
      "locationBasis": "Geocoded published campus address; approximate location, not a parcel outline.",
      "locationAccuracyM": 150,
      "lat": 41.79642,
      "lng": -88.24307,
      "sources": [
        {
          "label": "CyrusOne campus profile",
          "url": "https://www.cyrusone.com/data-centers/north-america/aurora-il"
        },
        {
          "label": "Published campus address",
          "url": "https://marketplace.upstack.com/data-centers/cyrusone-data-center-chicago-aurora-ii"
        }
      ],
      "inDistrict": false,
      "boundaryDistanceM": 12350,
      "nearBoundary": false
    },
    {
      "id": "edged-aurora",
      "name": "Edged Chicago campus",
      "place": "Aurora",
      "status": "operating",
      "statusLabel": "Operating · second building under construction",
      "statusEvidence": "Edged reports that its first building opened in February 2025. Its 4 June 2026 update says the second building has topped out, with completion anticipated in the second quarter of 2027. The campus is counted once under Operating.",
      "sourceDateLabel": "4 June 2026 operator update",
      "locationLabel": "2835 Bilter Road, Aurora",
      "locationBasis": "Geocoded operator address; approximate campus location.",
      "locationAccuracyM": 200,
      "lat": 41.80696,
      "lng": -88.24099,
      "sources": [
        {
          "label": "Edged construction update · June 2026",
          "url": "https://edged.us/news/edged-us-tops-out-second-sustainable-data-center-on-edged-chicago-campus"
        },
        {
          "label": "Edged Chicago campus",
          "url": "https://edged.us/chicago"
        }
      ],
      "inDistrict": false,
      "boundaryDistanceM": 13463,
      "nearBoundary": false
    },
    {
      "id": "meta-dekalb",
      "name": "Meta DeKalb campus",
      "place": "DeKalb",
      "status": "operating",
      "statusLabel": "Operating campus",
      "statusEvidence": "Meta's DeKalb information sheet identifies an operational data center campus. One pin represents the campus; it does not imply that every future building or phase is complete.",
      "sourceDateLabel": "undated operator information sheet",
      "locationLabel": "1510 East Gurler Road, DeKalb",
      "locationBasis": "Geocoded published campus address; approximate location.",
      "locationAccuracyM": 250,
      "lat": 41.88922,
      "lng": -88.72708,
      "sources": [
        {
          "label": "Meta DeKalb information sheet",
          "url": "https://datacenters.atmeta.com/asset/dekalb-data-center-info-sheet/"
        },
        {
          "label": "City record identifying campus address",
          "url": "https://www.cityofdekalb.com/DocumentCenter/View/18580/8-FOIA-Rpt-Nov-2024"
        }
      ],
      "inDistrict": false,
      "boundaryDistanceM": 19933,
      "nearBoundary": false
    },
    {
      "id": "cyrusone-yorkville-chi11",
      "name": "CyrusOne Yorkville · CHI11",
      "place": "Yorkville",
      "status": "construction",
      "statusLabel": "Construction · site work underway",
      "statusEvidence": "CyrusOne reports that site work began in early 2026. Yorkville's register lists the 2026 campus amendment as approved. The operator anticipates initial operations in 2028; this is not an operating facility. This project is separate from the withdrawn Phase 2 application.",
      "sourceDateLabel": "operator project update describing early 2026 work; 2026 city approval register",
      "locationLabel": "East of Eldamain Road, north of Faxon Road",
      "locationBasis": "Representative point within the municipal project-map area; approximate to about 600 metres.",
      "locationAccuracyM": 600,
      "lat": 41.6805,
      "lng": -88.48,
      "sources": [
        {
          "label": "CyrusOne construction status",
          "url": "https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus"
        },
        {
          "label": "Yorkville CHI11 project record",
          "url": "https://www.yorkville.il.us/940/C1-Yorkville-Cyrus-One-CHI-11-Data-Cente"
        },
        {
          "label": "City approval register",
          "url": "https://www.yorkville.il.us/933/Data-Center-Information-Archived"
        },
        {
          "label": "Municipal project map",
          "url": "https://www.yorkville.il.us/ImageRepository/Document?documentId=13084"
        }
      ],
      "inDistrict": true,
      "boundaryDistanceM": 2821,
      "nearBoundary": false
    },
    {
      "id": "project-cardinal",
      "name": "Project Cardinal",
      "place": "Yorkville",
      "status": "planned",
      "statusLabel": "Approved / planned campus",
      "statusEvidence": "Yorkville's register lists approvals for Project Cardinal, including 2026 amendments. The municipal project record describes a roughly 1,037-acre campus with revised phasing. These planning approvals do not establish construction completion or operation.",
      "sourceDateLabel": "2026 city approval register; July 2026 phasing amendment",
      "locationLabel": "Northwest of Route 47 & Galena Road, south of Baseline Road",
      "locationBasis": "Representative point within the municipal project-map area; approximate to about 1 kilometre. Parts of a large campus may differ from the pin's district relation.",
      "locationAccuracyM": 1000,
      "lat": 41.716,
      "lng": -88.46,
      "sources": [
        {
          "label": "Yorkville Cardinal phasing record",
          "url": "https://www.yorkville.il.us/944/Project-Cardinal-Data-Center-Campus-Majo"
        },
        {
          "label": "City approval register",
          "url": "https://www.yorkville.il.us/933/Data-Center-Information-Archived"
        },
        {
          "label": "Municipal project map",
          "url": "https://www.yorkville.il.us/ImageRepository/Document?documentID=13360"
        }
      ],
      "inDistrict": true,
      "boundaryDistanceM": 620,
      "nearBoundary": true
    },
    {
      "id": "project-steel",
      "name": "Project Steel · Prologis",
      "place": "Yorkville",
      "status": "planned",
      "statusLabel": "Approved / planned campus",
      "statusEvidence": "Yorkville's 2026 register lists approval ordinances for Project Steel. Its revised municipal project page describes an approximately 540-acre proposal. The approval record is not evidence that data centers are operating.",
      "sourceDateLabel": "18 March 2026 project revision; 2026 city approval register",
      "locationLabel": "East of Eldamain Road, between Corneils & Galena Roads",
      "locationBasis": "Representative point within the municipal project-map area; approximate to about 1 kilometre.",
      "locationAccuracyM": 1000,
      "lat": 41.701,
      "lng": -88.479,
      "sources": [
        {
          "label": "Yorkville Project Steel record",
          "url": "https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A"
        },
        {
          "label": "City approval register",
          "url": "https://www.yorkville.il.us/933/Data-Center-Information-Archived"
        },
        {
          "label": "Municipal project map",
          "url": "https://www.yorkville.il.us/ImageRepository/Document?documentId=11517"
        }
      ],
      "inDistrict": true,
      "boundaryDistanceM": 2258,
      "nearBoundary": false
    },
    {
      "id": "equinix-minooka",
      "name": "Equinix Minooka · CH8",
      "place": "Minooka",
      "status": "planned",
      "statusLabel": "Planned · industry-reported project",
      "statusEvidence": "The Baxtel industry directory describes a planned Equinix campus near Ridge & Holt Roads. This record uses that published project listing; operating status has not been established.",
      "sourceDateLabel": "undated industry project listing",
      "locationLabel": "Ridge Road area, north of Holt Road, Minooka",
      "locationBasis": "Approximate campus point published by the cited industry directory; about 600 metres of location uncertainty.",
      "locationAccuracyM": 600,
      "lat": 41.4808,
      "lng": -88.27069,
      "sources": [
        {
          "label": "Baxtel Minooka project listing",
          "url": "https://baxtel.com/data-center/equinix-minooka-ch8"
        }
      ],
      "inDistrict": true,
      "boundaryDistanceM": 1489,
      "nearBoundary": false
    },
    {
      "id": "tract-morris",
      "name": "Tract Morris Technology Park",
      "place": "Morris",
      "status": "planned",
      "statusLabel": "Proposed · site zoned for development",
      "statusEvidence": "The City of Morris describes a proposed data center project on approximately 343 acres already zoned for industrial development. Its public resource page discusses prospective development; it does not establish an operating campus.",
      "sourceDateLabel": "undated city project resource page",
      "locationLabel": "South of US Route 6, east of Gun Club Road",
      "locationBasis": "Approximate directory campus point consistent with the city's road description; about 500 metres of location uncertainty.",
      "locationAccuracyM": 500,
      "lat": 41.40091,
      "lng": -88.37932,
      "sources": [
        {
          "label": "City of Morris project resources",
          "url": "https://morrisil.org/data-center-resources/"
        },
        {
          "label": "Baxtel campus location",
          "url": "https://baxtel.com/data-center/tract-morris-tech-park"
        }
      ],
      "inDistrict": false,
      "boundaryDistanceM": 712,
      "nearBoundary": false
    },
    {
      "id": "powerhouse-joliet",
      "name": "PowerHouse Joliet",
      "place": "Joliet",
      "status": "planned",
      "statusLabel": "Approved / planned campus",
      "statusEvidence": "ABC7 reported city approval on 19 March 2026. The developer describes a future data center campus east of the speedway. These sources support a planned project; they do not establish operating facilities.",
      "sourceDateLabel": "19 March 2026 approval report; undated developer project page",
      "locationLabel": "Rowell Road / Bernhard Road area, east of the speedway",
      "locationBasis": "Geocoded road-junction reference for the project area, not a site entrance. Approximate to about 1.2 kilometres.",
      "locationAccuracyM": 1200,
      "lat": 41.4592,
      "lng": -88.06016,
      "sources": [
        {
          "label": "PowerHouse project profile",
          "url": "https://www.powerhousedata.com/data-center/powerhouse-joliet"
        },
        {
          "label": "ABC7 city approval report · March 2026",
          "url": "https://abc7chicago.com/post/data-centers-illinois-city-council-approves-plans-joliet-center-bernhard-rowell-east-speedway/18737463/"
        }
      ],
      "inDistrict": false,
      "boundaryDistanceM": 16006,
      "nearBoundary": false
    },
    {
      "id": "meyer-withdrawn",
      "name": "Meyer rezoning application",
      "place": "Yorkville",
      "status": "withdrawn",
      "statusLabel": "Withdrawn · 14 April 2026",
      "statusEvidence": "Yorkville states that the applicants withdrew the rezoning request on 14 April 2026. The former application contemplated potential data center use on the western parcel. This is not an active proposal in this snapshot.",
      "sourceDateLabel": "14 April 2026 municipal withdrawal notice",
      "locationLabel": "South of Corneils Road, east of Beecher Road",
      "locationBasis": "Approximate point based on the municipal road description; about 700 metres of location uncertainty.",
      "locationAccuracyM": 700,
      "lat": 41.6865,
      "lng": -88.468,
      "sources": [
        {
          "label": "Yorkville withdrawal notice",
          "url": "https://www.yorkville.il.us/919/Meyer-Rezone"
        }
      ],
      "inDistrict": true,
      "boundaryDistanceM": 1706,
      "nearBoundary": false
    },
    {
      "id": "cyrusone-phase2-withdrawn",
      "name": "CyrusOne Yorkville · Phase 2 application",
      "place": "Yorkville",
      "status": "withdrawn",
      "statusLabel": "Withdrawn · 17 April 2026",
      "statusEvidence": "Yorkville states that all applications for this Phase 2 proposal were withdrawn on 17 April 2026. This withdrawn application is distinct from the CHI11 campus west of Beecher Road, where site work is underway.",
      "sourceDateLabel": "17 April 2026 municipal withdrawal notice",
      "locationLabel": "East of Beecher Road, between Faxon & Corneils Roads",
      "locationBasis": "Approximate point based on the municipal road description; about 600 metres of location uncertainty.",
      "locationAccuracyM": 600,
      "lat": 41.6815,
      "lng": -88.467,
      "sources": [
        {
          "label": "Yorkville Phase 2 withdrawal notice",
          "url": "https://www.yorkville.il.us/923/C1-Yorkville---Phase-2-Data-Center-Campu"
        }
      ],
      "inDistrict": true,
      "boundaryDistanceM": 1745,
      "nearBoundary": false
    }
  ]
}